Petex Integrated Production Modeling Mbal | Prosper | GAP
Scope of Work : Full Asset Model
Client Location : Doha, Qatar
Brief Description :
- Review the behaviour of a deep water (1.5km) gas reservoir. Build an MBal multi-tank model that accurately represents the performance of the reservoir.
- Update the Prosper models to accurately represent the completion, match the PVT and the production tests to ensure the models accurately calculate the well rates.
- Update the GAP model ensuring the true seabed-to-surface topology is captured and match the model with the available production and pressure data.
- Run various prediction scenarios to determine the different field development options and make recommendations.